Welcome to the official website of Zibo Yahao Electromechanical Accessories Co., Ltd.!

Search

Copper tube:+86-13355208809

Vacuum pump: +86-13754767721

Mail:sddjg@sddjg.cn

>
>
>
Installation and parameter adjustment of electrode tubes of drilling machines

Brass electrode tube φ0.3-1.0mm

φ1.1-1.5mm

φ1.5-3.0mm

Brass electrode tube

Red copper electrode tube φ0.3-1.0mm

φ0.2-0.25×200mm

Main products

Contact us

Zibo YHAO Electromechanical Accessories Co., Ltd. 
Address: No. 74, West Road, Zhangdian Mall, Zibo City, Shandong Province
Copper tube phone: 13355208809
Vacuum pump phone: 13754767721
E-mail: sddjg@sddjg.cn
Website:
http://en.cndjg.cn

Zibo YHAO Electromechanical Accessories Co., Ltd. 
Add: No.74 Shangcheng Road West, Zhangdian District, Zibo, Shandong
Phone:+86-13355208809 

Mail:sddjg@sddjg.cn
URL:http://en.cndjg.cn

 

Copyright © 2019         Zibo YHAO Electromechanical Accessories Co., Ltd.            鲁ICP备19004371号-1           国际站建设:中企动力 淄博 外贸谷歌推广

Installation and parameter adjustment of electrode tubes of drilling machines

Page view
[Abstract]:
When installing the electrode copper tube, be careful to avoid bending the copper tube. Install and clamp the applicable capillary electrode in the sealing clamp

When installing the electrode copper tube, be careful to avoid bending the copper tube. Install and clamp the applicable capillary electrode in the sealing clamp, and make the copper tube extend the water sealing ring 2 mm to 3 mm. Move the spindle to align the electrode with the guide hole, and through the guide hole. Adjust the workpiece to align the electrode with the machining position.